The process · 4 steps

Inspection to
punch list.

A repeatable four-step sequence from your first text to the magnet sweep at the end. No surprises. No subcontract chasing. No scope creep.

  1. 01

    Free Inspection

    We climb the roof, walk every slope, and document every soft spot, lifted shingle, broken flashing, and worn boot with timestamped photos. Visual + moisture-meter scan. Attic inspection from underneath when there is an active leak.

    What you do

    Text a couple of photos and your address. We schedule within 48 hours.

    What we do

    Full roof walk, attic check, photo set, written condition report.

  2. 02

    Flat Estimate

    Itemized quote in plain English — every line spelled out by brand and quantity. If insurance is in play, we send the same scope to your adjuster and walk you through what is covered. No high-pressure sales meeting.

    What you do

    Review the quote. Ask anything. We respond within 24 hours.

    What we do

    Itemized PDF, optional adjuster coordination, manufacturer warranty details.

  3. 03

    Schedule the Build

    Materials delivered the morning of, dumpster set, yard tarped before crews start. Most residential reroofs finish in a single day. Multi-day projects come with a written schedule and a single foreman as your contact.

    What you do

    Move cars out of the garage. Otherwise, keep your day.

    What we do

    6 AM start, 6-person crew, full tear-off + decking + underlayment + install.

  4. 04

    Final Walkthrough

    Three magnet sweeps over the yard, driveway, and gutters. Full photo set of the finished work. Written workmanship warranty signed before we collect final payment. If anything looks off in the first 90 days, we come back free.

    What you do

    Walk it with us. Sign off on what you see.

    What we do

    Magnet sweep ×3, photo set delivered by email, 5-year warranty signed.

Day of · 1-day reroof

A real timeline. Hour by hour.

  1. 6:30 AMMaterials drop · driveway staged · dumpster placed01/7
  2. 7:00 AMTear-off begins · six-man crew on the roof02/7
  3. 11:00 AMDecking inspection · soft spots replaced03/7
  4. 12:00 PMSynthetic underlayment + ice & water shield rolled04/7
  5. 1:00 PMDrip edge installed · shingle install starts05/7
  6. 4:30 PMRidge vent installed · ridge cap shingles laid06/7
  7. 5:30 PMMagnet sweep · final walkthrough · drive away07/7

Ready to start? Let's get it handled.

Most inspections scheduled the same week. Storm calls get bumped to the front of the queue.